Brendan worked as a Student Field Coordinator for EllisDon on Oakridge Park, a $400 million contract inside a multi-billion dollar redevelopment. Construction is unforgiving in a specific way: drawings change, trades stack up, and the schedule does not wait. The job was keeping all three pointed the same direction, and recording what actually happened on site.

01 / Project

Summer 2025

Oakridge Park Redevelopment

Oakridge Park Redevelopment, EllisDon
Organisation
EllisDon
Role
Student Field Coordinator
Status
Placement complete
Scope
Construction · Field Coordination · Mixed Use

The project

Oakridge Park replaces the old Oakridge Centre in central Vancouver. Fourteen towers, roughly five million square feet of mixed use, and housing for about six thousand people. Trade press puts the whole redevelopment at $4.5 billion. EllisDon holds construction management, and the contract Brendan worked under was $400 million of it.

The work

Field coordination is mostly sequencing and record. Which trade is where, whether the drawing in their hand is the current one, whether the work in front of them is actually ready to be worked on, and what happened by the end of the day. On a site this size the last part carries the most weight, because the daily record is what the next morning gets planned from.

What made it hard

  • Drawings revise while work is already underway, so the current sheet and the sheet someone is holding are not reliably the same sheet.
  • Trades stack. One crew running late moves three others, and a schedule that size does not absorb it on its own.
  • Inspections have windows. Miss one and everything behind it waits.
  • It is a live site. Nothing pauses so that coordination can catch up.

What carried over

Software fails the same way. Most of what goes wrong is not technical, it is a handoff where each side assumed the other was ready. Both products below exist because somebody was doing that reconciliation by hand.